Toland Road - Landfill Expansion
|
Client: Ventura Regional Sanitation DistrictVentura, California Project Description: EBA designed, permitted and provided construction management and construction quality assurance (CQA) services for engineered alternative base liner designs for Phase IIA and Phase IIB. EBA also designed and permitted the Phase I clay liner constructed over existing waste. The project presented numerous challenges including limited remaining air space which accelerated design, permitting and construction schedules; and combined close proximity of the site to a major fault and the requirement that lined slopes be excavated at 1.5:1 to reduce earthwork costs and avoid sensitive riparian habitat.EBA Provided the Following Services:
|
| |||